Distribution grid models for interconnection

Ryhla models each feeder on the distribution and subtransmission grid. Developers use the results to choose sites and size 1–50 MW projects.

Our clients interconnect faster and at lower cost.

Test us on a project

Backed by Y Combinator

The distribution grid is a black box

Most developers find out whether the grid can take their project only after they have filed for interconnection, paid and waited months.

Ryhla makes the grid visible and quantifies interconnection risk upfront.

How it works

Ryhla has built models of distribution and subtransmission networks.

  • Trained on proprietary data and aligned with interconnection standards.
  • Backtested against utility study results.
  • Used by developers to find sites, choose the feeder and point of interconnection, and size projects before filing.

Coverage

Feeder-level models live today

Illinois
ComEd
California
PG&E, SCE
New York
NYSEG, RG&E, Central Hudson
New Jersey
PSE&G
Texas
Oncor
Virginia
Dominion Energy
Colorado
Xcel Energy
Georgia
Georgia Power
More territoriesAsk about yours
Utility territoriesModeled today
© OpenStreetMap

Projects of 1–50 MW

At distribution and subtransmission voltages.

Team

Ryhla brings together engineers and researchers in electrical engineering and computational modeling.
The founders come from École Polytechnique and Stanford, where they conducted research in grid intelligence.

École PolytechniqueStanford University

Founders

Sara El Baghdadi
Sara El BaghdadiCo-founder
Yassine Guennoun
Yassine GuennounCo-founder

Test us on a project

Tell us about your project. Our team will get back to you.